blog

16.03.12

Adapt(able) Parking Structures?

 

Recently, one of our collaborators discussed with us a project in which the client asked them to construct the adjacent parking structure floor to floor heights the same as their new building. The idea is that when the new building reaches capacity they will be able to easily convert the parking structure into inhabitable floor space (parking would move to a neighbouring site).  It made me think about what other constraints might hinder the practicality of such an act and how feasible would it be to convert a conventional parking structure to other uses?  Is it simply an issue of increasing floor to floor heights, typically designed at a minimum for cost efficiency given the weight of the concrete structure, or would more unconventional design measures need to be considered either initially or at the point of conversion?

 

For example, what do you do with the ramps?  – Do you design them as a modular solution which can be disassembled and easily removed upon conversion or do you try to fit them out with a new use such as slanted travelators?  If they remain, …

Latest Activity
14.03.12

Improving Building Feedback for Architects

 

It is not disputed that buildings will need to change over time to accommodate the irresolute demands of its users. Nor, that the more conducive to change a building is, the longer it will remain useful, making it inherently more sustainable. However, buildings are usually built to fit a specific purpose for a particular moment in time, defined in a financially strict brief and proposed by a client that is generally not an expert in the built environment. In such a commercially driven industry, this means that none of the actors have a specific remit to consider the future of the building, rather, just the completion and documentation of it, and the conception of the next. This is in stark contrast to research highlighting architects interest in continually learning about their buildings in order to expand their knowledge in an ever more competitive business.

Currently there is a lot of attention being paid to feedback techniques that attempt to encapsulate knowledge of a building in use, and subsequently feedback relevant information to architects in order to improve design quality (Gorgolewski 2005). However, these techniques concentrate on …

06.03.12

Student Competition Feedback

Registration is now open!

DEADLINE EXTENDED TO JUNE 10th! Given the end of term and project deadlines for some universities we’ve decided to extend the deadline.  The 10th of June is the latest possible date and hope this helps students wanting to submit a proposal.

 

 

In an effort to share feedback from queries about the competition, we will use this post as an evolving piece of information for interested applicants.  Feel free to post queries/ comments here and we will respond to them in a timely manner.  Many thanks for everyone’s interest.

 

Are team-based submissions okay?  Submissions can be team-based or individual (as long as all participants are students).  Teams should not exceed 4 individuals.  The prizes are obviously not scaled!

 

Does the submission have to be a building?  No, your submission may take a variety of forms and scales, e.g. a public space, a product, a building system, or a cluster of buildings (e.g. a neighborhood).  The key is to illustrate how your proposed solution responds to a variety of changes.  A good way to do this is to envision a …